黑料专区

Duo-Gard鈥檚 New BIM Families Shorten Design Time for Ground-up Canopy Structures

Date: 2 July 2019
Source:
Mike Merritt, Duo-Gard鈥檚 structural engineer
Photo source
Mike Merritt, Duo-Gard鈥檚 structural engineer | Photo: www.duo-gard.com

Date: 2 July 2019

With the advances of Building Information Modeling and Revit, architects are honing the design development process with tools that expedite, save money, ensure accuracy and allow flexibility.

Few product manufacturers integrate these two tools into a total turnkey package. Duo-Gard does, shortening conceptual design time from weeks to minutes for its canopy systems.

鈥淲ith Revit as the design engine creating data for BIM, we can design out an entire structure from the ground up, viewing it in a 3-D format,鈥 says Mike Merritt, Duo-Gard鈥檚 structural engineer. 鈥淒uo-Gard is an industry leader in bringing the benefits of this technology to the architecture and design community.鈥

The turnkey package is in final development 鈥 slated for July 鈥 for Duo-Gard鈥檚 canopy designs.

First up are the , the company鈥檚 patented award-winning system, and the 2500 batten series. Other canopy systems and structures will follow.

As Duo-Gard鈥檚 new on-staff structural engineer, Merritt headed the team in developing the design and fabrication package. He points to the time-saving feature as one of the most impressive components.

鈥淲hat used to take two to three weeks can now be done in minutes,鈥 he says, 鈥渃utting lead times significantly. We no longer have to rely on outside resources. And our in-house steel and aluminum fabrication capabilities complete the package.鈥

Merritt says architects can 鈥渦tilize our model and implement it into their design, allowing them to aesthetically assemble the structure including glazing, columns, rafters and purlins.鈥 Architects can now consider configuration options at a design鈥檚 earliest stages and be confident the solutions are accurate and cost effective.

Merritt joined Duo-Gard in December 2018. A graduate of the University of Toledo with a B.S. in Construction Engineering Technologies, he was previously a project manager and project engineer. His areas of expertise include structural analysis, steel/aluminum fabrication, electrical and lighting design.

Duo-Gard鈥檚 first model 鈥 available in July 鈥 is the single cantilever canopy, comprised of a W- shape column and tapered outrigger complete with our 2500 Series batten and Sleekline glazing options. 鈥淲e鈥檒l be bringing other models to market in early fall,鈥 Merritt says.

He adds that the model is now available to benefit architects immediately. Information will be available on the company鈥檚 website in late July. Mike Merritt invites inquiries at 734-207-9700 or his direct email mmerritt@duo-gard.com.

600450 Duo-Gard鈥檚 New BIM Families Shorten Design Time for Ground-up Canopy Structures 黑料专区

Others also read

On May 15, 2026, Nicosia became a hub for innovation, design, and urban planning, hosting the 6th edition of the SHARE Cyprus International Architecture Forum.
Josh Rudd joins NGA Chief Content Officer Katy Devlin and NGA Director of Membership Sara Neiswanger to break down what AI actually means for a glass fabrication business.
Connecting leading architects and contractors across Europe, the Middle East, Central Asia, and the Caucasus.
Forterro announces the acquisition of Klaes, strengthening its presence in the European windows, doors, and fa莽ades software market.
This video shows how to use the new Glaston FlatGuard.
On the occasion of MECSPE 2026 (BolognaFiere, 4鈥6 March), Tecnest presents itself as an integral part of the Scm Group digital ecosystem, aimed at strengthening its technological offering dedicated to the manufacturing sector.

Add new comment

From industry

Waterman Business Centre Suite 220, 44 Lakeview Drive
Scoresby VIC 3179
Australia

Pol铆gono 尝补濒铆苍 2000
36512 尝补濒铆苍 Pontevedra
Spain

Ctra. Estaci贸n Km. 15.8
44415 Rubielos de Mora Teruel
Spain

NEWS RELATED PRODUCTS

LISEC Austria GmbH
A+W Software GmbH
A+W Software GmbH
A+W Software GmbH
A+W Software GmbH