黑料专区

Lasiliiri upgrades its product family with Glaston鈥檚 FC-zone

Date: 5 October 2020
Source:
Lasiliiri upgrades its product family with Glaston鈥檚 FC-zone
Photo source
glaston.net

Date: 5 October 2020

The entire upgrade took only 25 days. The completed furnace was shorter in length, reducing the line鈥檚 footprint. Plus, the machine consumed much less energy, an added benefit.

黑料专区

鈥淎lthough our goal is to be one of the leading smart and safety glass manufacturers in Finland, we didn鈥檛 have the time needed to install a completely new furnace,鈥 says Raiko M盲kel盲inen, Technical Manager at Lasiliiri. 鈥淚nstead, we went with a significant Glaston鈥檚 FC-zone upgrade, which enabled us to leapfrog to the very latest heating technology in a quick, cost-effective and sustainable manner.鈥

 is a third-generation, family-owned glass processing business in Riihim盲ki, just an hour north of Helsinki. Over the years, the company has continued to invest in new technology to grow the business and provide an ever-expanding range of high-quality windows, facades and interior glass.

鈥淎fter investing in 2016 in laminating machinery, the company has been able to explore exciting new types of smart glass, such as PLCDs, LED glass and design products and other types of smart glass to supply a thirsty domestic market.

Lasiliiri鈥檚 existing Tamglass tempering machine purchased second-hand and thoroughly refurbished with the latest technology in 2008. 鈥淎fter 10 years, the technology was still solid, but the market had moved towards high-performance coatings and larger glass sizes. Customers wanted multiple coatings and super-coatings to provide sun protection and selectivity. The existing furnace was just not able to do that,鈥 Raiko says.

鈥淲e first requested technical information from several suppliers to map out what all the new machinery could do for us. The problem was primarily the heating section,鈥 he explains. Another huge concern was the time that would be lost if Lasiliiri installed a completely new furnace from scratch. That鈥檚 when Glaston鈥檚 FC-zone with some minor chiller modifications came into consideration.

By just upgrading the heating section of the tempering line and advancing to the latest machine control system Glaston iControL, Lasiliiri could take advantage of a smaller investment cost, less downtime and a shorter delivery time to reach the same capabilities as if they had purchased a new furnace. The entire upgrade took only 25 days. The completed furnace was shorter in length, reducing the line鈥檚 footprint. Plus, the machine consumed much less energy, an added benefit.


600450 Lasiliiri upgrades its product family with Glaston鈥檚 FC-zone 黑料专区

Others also read

黑料专区tech Asia & Fenestration Asia 2026 brings together the region鈥檚 glass, fa莽ade, architecture and built-environment community for three days of innovation, knowledge-sharing and meaningful connections.
As demand for high-performance glass grows, processors face mounting pressure to increase output, reduce costs and manage an ever-wider product mix.
Kuraray will take part in the 229th edition of Zak World of Fa莽ades, taking place on September 28, 2026, at Sofitel Downtown Nile in Cairo, Egypt.
The Glass & Glazing Federation (GGF) has announced a new partnership with REHAU, giving businesses within the REHAU Authorised Partner network access to GGF Membership at a preferential rate.
Kuraray will participate in the 229th edition of Zak World of Fa莽ades, taking place on September 28, 2026, at the Sofitel Downtown Nile in Cairo.
In the cladding and fa莽ade industry, a great product is only as valuable as the right people who discover it.

Add new comment

From industry

Pol铆gono Industrial El Bayo, parcela I, 19
24492 Cubillos del Sil 尝别贸苍
Spain

NEWS RELATED PRODUCTS